Prestige Line Contracting

Blog

Get StartedView our Portfolio


All
Advice & FAQs
Bathrooms
Cost Guides
Entire Homes
Kitchens
Process & Planning

  • Home
  • Services
    • Home Renovations
    • Bathroom Remodeling
    • Kitchen Remodeling
  • Portfolio
  • About Us
    • Our Story
    • SERVICE AREA
  • Pricing
    • Home Renovation Prices
    • Bathroom Remodeling Prices
    • Kitchen Remodeling Prices
  • Blog
  • Contact Us
  • 914-762-0577

3/14/2024

How Long does a bathroom remodel takeplace in westchester county?

Read Now
 
Embarking on a bathroom renovation journey in Westchester County? Among the most frequently asked questions are "How long does a bathroom renovation usually take?", or “How long does it take a contractor to remodel a bathroom?”. The short answer is that it depends on the project’s scope of work, and pre-planning involved.
 
In this article, we guide you through the expected timeline for remodeling a standard bathroom (40 square feet; or 5 feet by 8 feet). This size is notably the most prevalent among homeowners embarking on bathroom renovations. We’ll outline the timeline assumption, phases of the bathroom remodel, factors extending the timeline, and a strategy to reduce disruptions.

TIMELINE ASSUMPTION
  • Standard Bathroom - 40 square feet (5’ x 8’)
  • Complete removal down to the studs, including debris disposal
  • Installation of a new vanity, toilet, and bathtub or shower in their original locations
  • New installation of floor tiles and tiles around the tub or shower.
  • You have a permit to remodel your bathroom. 
Bathroom Renovation in Westchester
Bathroom Remodel in Westchester
​UNDERSTANDING THE RENOVATION TIMELINE
 
A bathroom renovation involves multiple phases, each with its own time frame. The typical timeline for a standard bathroom remodel ranges from 6 to 8 weeks.
Picture
FACTORS EXTENDING THE TIMELINE & HOW TO SOLVE IT
 
When diving into a bathroom renovation, you might wonder, "How long does it take a contractor to remodel a bathroom?" While the ideal timeline hovers around a neatly packed schedule, real-world scenarios like permit approval delays, unforeseen structural challenges, and the hunt for that perfect custom material can stretch the timeline further than anticipated
 
The number one key to a smooth and efficient bathroom renovation is thorough PRE-PLANNING, COMMUNICATION, and more PRE-PLANNING.
 
Here are some factors that could extend your renovation timeline, along with how pre-planning addresses these issues:

SCOPE OF WORK
  • Issue: You and the contractor are not on the same page of what’s included in the scope of work, or even worse, you complete the renovation and the bathroom isn’t what you envisioned. For example, you might complete the remodel only to find the tile layout isn't what you envisioned, leaving you dissatisfied despite the time and effort invested.
  • Solution: Ensuring clarity on what is included in the project scope to align expectations. This includes discussions on micro design details such as tile layouts, outlet placements, plumbing mounting locations, etc.

LOGISTICS & WORK HOURS
  • Issue: Constraints on work hours can slow progress, especially in co-op buildings. Will the contractor need to navigate from the basement to the second floor to access the bathroom? These logistics matter.
  • Solution: Establishing logistics, including material staging areas, work hours, home access, and communication protocols. Your contractor should communicate how these factors can affect the timeline.

PERMITS
  • Issue: Lack of communication about the need for a permit can unexpectedly extend your timeline. You might be ready for a 4 to 6-week project, but permit requirements could push this to 6 to 8 weeks. Not obtaining a permit could lead to a stop work order, halting construction entirely.
  • Solution: Your kitchen & bathroom contractor should determine the need for permits in advance to prevent construction delays from stop work orders. Your contractor should also communicate the extended timeline.

UNEXPECTED ISSUES OR ADDITIONAL WORK:
  • Issue: Sometimes, walls and floors hide surprises that require attention, adding time to your project. Additionally, expanding the project scope without realizing it qualifies as "additional work / change order" can result in an unforeseen "change order" bill at the project's conclusion.
  • Solution: Most elite contractors conduct post-demolition inspections to discuss any surprised uncovered and keep you informed of any "additional work / change order" and their related costs. A top-notch contractor will maintain consistent communication, helping to prevent any unexpected charges at the end of the project.
MATERIALS DELAY, OR AVAILABILITY OF CUSTOM MATERIALS
  • Issue: The quest for bespoke materials or unexpected delays in supply can also extend the timeline. Example: a damaged bathtub arriving early in the demolition phase can pause construction until a replacement arrives, potentially delaying the project by weeks.
  • Solution: If possible, order and store all materials at your home before the project starts to allow time for sourcing replacements if damages occur. If space is limited, your contractor can assist in planning a tailored material delivery schedule.

Streamlining Your Bathroom Renovation Journey
Embarking on a luxury bathroom renovation is about more than just the final look; it's about ensuring a smooth, stress-free process from start to finish.

An experienced kitchen and bathroom contractor will understand the importance of thorough pre-construction planning and clear, consistent communication. This approach is key to a seamless renovation, ensuring that every detail is considered well before construction begins, aligning perfectly with your vision.

Are you ready to start your luxury bathroom renovation in Westchester County? Let's create a space that reflects your dream bathroom with a journey that's as refined and satisfying as the end result.
GET YOUR QUOTE

Share

2/19/2024

Westchester Kitchen Electrical Code Basics

Read Now
 
Today, we're focusing on Basic Kitchen Electrical Code, a must-know for anyone in Westchester County looking to remodel their kitchen or even during the initial stages of building a new home. One common question we encounter is, "When a new house is built, how do they decide where to place electrical outlets?" This consideration is especially crucial in kitchen design, where the placement of outlets can impact both the functionality and safety of the space. Whether you're aiming for a luxury renovation or a simple update, understanding these codes ensures a safer and more functional space.
 
GFCI-Protected Small Appliance Circuit:
  • Requirement: Minimum of two 20-amp, 120-volt circuits for GFCI receptacles in countertops and dining areas.
  • Reason: To support high-powered appliances and to distribute electrical load, preventing overloads.
 
Basic Lighting Circuit:
  • Requirement: At least one 15-amp, 120-volt circuit for kitchen lighting, not on a GFCI circuit.
  • Reason: To provide reliable, permanent lighting without risk of accidental shutoffs.
 
Distance Between GFCIs Over Countertops:
  • Requirement: No more than 48 inches between countertop receptacles.
  • Reason: To minimize the need for stretching appliance cords, enhancing safety and convenience.
 
Tamper-Resistant (TR) Outlet:
  • Requirement: All kitchen outlets (15 and 20 amp) to be tamper-resistant.
  • Reason: To prevent electrical accidents, especially involving children.
 
Countertop Section 12 Inches Wide or More:
  • Requirement: Each countertop section of this width must have a receptacle (GFCI).
  • Reason: To ensure accessibility to power sources for appliances, even in smaller kitchen areas.
 
Dishwasher Circuit:
  • Requirement: One 15-amp, 120-volt dedicated circuit with 14/2 cable.
  • Reason: For consistent power supply and to prevent the circuit from tripping off.
 
Garbage Disposal Circuit:
  • Requirement: One 15-amp, 120-volt dedicated circuit with 14/2 cable.
  • Reason: To handle the high initial power surge of garbage disposals without affecting other appliances.
 
Microwave Circuit:
  • Requirement: One 20-amp, 120-volt dedicated circuit with 12/2 cable.
  • Reason: To accommodate the higher power requirements of microwave ovens.
 
Electric Range Circuit:
  • Requirement: One 50-amp, 120/240-volt dedicated circuit with appropriately sized wire cable.
  • Reason: To support the high power demand of electric ranges without impacting other kitchen functions.
 
 
About Kitchen Electrical Codes:
Understanding kitchen electrical codes is crucial for a safe, efficient kitchen remodel. These codes are regularly updated to adapt to modern kitchen needs, ensuring safety and functionality.
 
Every three years, the NFPA updates the code to align with modern kitchen needs, meaning kitchen remodels must meet current standards

Ready to start your kitchen remodeling journey?
In conclusion, the response to "When a new house is built, how do they decide where to place electrical outlets?" in the context of a kitchen, is that the decision is influenced by several key factors. These include the intended locations for appliances, the configuration of workspaces, and, most critically, the adherence to kitchen electrical codes.

Ready to transform your kitchen in Westchester? Connect with Prestige Line Contracting for modern kitchen upgrades in Westchester County.
GET YOUR QUOTE

Share

1/4/2024

Ventilation Essentials: Keeping Your Bathroom Mold-Free

Read Now
 
At Prestige Line Contracting, while we understand the appeal of a visually stunning bathroom with perfect tiles, luxurious tubs, and sleek fixtures, we also prioritize a crucial yet often overlooked aspect of luxury bathroom renovation in Westchester County: proper ventilation. Our focus isn't solely on aesthetics; we're equally committed to ensuring the healthfulness and longevity of your luxury bathroom.
​
Why Is Proper Ventilation Crucial?

In our extensive experience as an expert bathroom contractor, we've seen numerous cases where bathrooms, despite their modern upgrades or aspirations for a luxury bathroom renovation, suffer from one major flaw – inadequate ventilation. This oversight can lead to a host of problems, especially mold growth.

The Hidden Danger of Ineffective Ventilation
In many homes, especially older ones, bathroom fans are not vented outside but rather to the attic. This is a critical mistake. Why? Because the moisture doesn't leave the premises; it circulates back into the bathroom or settles in the attic, creating a breeding ground for mold and mildew. Our custom bathroom remodeling approach always includes assessing and upgrading the ventilation system a vital part of any luxury bathroom renovation.

Picture
The Right Way to Vent
A properly vented bathroom directs moisture out of your home, ensuring a dry and healthy environment. This involves connecting the bathroom fan with a flexible duct to either the roof or the side of the house – a practice often overlooked in standard bathroom makeovers.
Picture
Understanding Bathroom Exhaust Fan Code Requirements
As experts in bathroom design and renovation, we adhere to the latest building codes. Here's a breakdown of what's required:
  • Option 1: A window in the bathroom for light and ventilation, with a minimum size of three square feet, half of which must be operable.
  • Option 2: A mechanical ventilation with a minimum size of 50CFM, venting outside the home (in compliance with section M1507 of the code), in lieu of a window.
 
The Benefits of a Bathroom Exhaust Fan
  1. Controlling Odors: Essential in a bathroom for obvious reasons.
  2. Humidity Control: Critical for comfort and for protecting various elements in your bathroom from moisture damage.
  3. Mold Prevention: Keeps surfaces dry, preventing the growth of mold and mildew.
  4. Preserving Paint and Building Materials: Protects against peeling paint, tile damage, and other moisture-related issues.
 
Professional Installation: A Must for Effective Ventilation
Given the complexity of proper ventilation, it's crucial to have a professional handle the installation. At Prestige Line Contracting, our expertise in bathroom remodeling extends to ensuring your bathroom's ventilation system is up to par. Selecting the right fan size, ensuring proper ductwork, and installing everything in compliance with safety and building codes are all critical steps in a successful luxury bathroom renovation.
 
Ready to start your bathroom remodeling journey?
Are you contemplating a bathroom renovation? Whether you're interested in the latest bathroom design trends, seeking professional tips, or simply want to stay informed about our work, subscribe to our newsletter for valuable insights and updates at Prestige Line Contracting.
GET YOUR QUOTE

Share

Forward>>
MAILING ADDRESS
P.O Box 656
​Ossining, NY 10562
PHONE
​​914-762-0577
EMAIL
​[email protected]
EOLLOW US ON:
© COPYRIGHT 2025 Prestige Line Contracting. ALL RIGHTS RESERVED.
  • Home
  • Services
    • Home Renovations
    • Bathroom Remodeling
    • Kitchen Remodeling
  • Portfolio
  • About Us
    • Our Story
    • SERVICE AREA
  • Pricing
    • Home Renovation Prices
    • Bathroom Remodeling Prices
    • Kitchen Remodeling Prices
  • Blog
  • Contact Us
  • 914-762-0577